Revision history of "Energy Efficiency at Tomar Hospital" (Q2981188)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:0819:08, 3 August 2022DG Regio talk contribs 42,135 bytes +25,446 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:4708:47, 9 July 2021DG Regio talk contribs 9,451 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:3201:32, 9 July 2021DG Regio talk contribs 9,020 bytes +1,195 Created claim: summary (P836): The Tomar Hospital aims to reconvert its energy systems in order to obtain significant savings, maintaining and improving service and security supply outputs. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in the hot water production system and insulation of the opaque cover., translated_summary
  • curprev 01:3201:32, 9 July 2021DG Regio talk contribs 7,825 bytes −1,195 Removed claim: summary (P836): The Tomar Hospital aims to reconvert its energy systems in order to obtain significant savings, maintaining and improving service and security supply outputs. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in the hot water production system and insulation of the opaque cover., remove_old_english_translation
  • curprev 01:1401:14, 9 July 2021DG Regio talk contribs 9,020 bytes +94 Changed label, description and/or aliases in en: translated_label
  • curprev 01:1401:14, 9 July 2021DG Regio talk contribs 8,926 bytes +1,195 Created claim: summary (P836): The Tomar Hospital aims to reconvert its energy systems in order to obtain significant savings, maintaining and improving service and security supply outputs. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in the hot water production system and insulation of the opaque cover., translated_summary

8 July 2021

7 July 2021