Revision history of "Construction of submarine cable for offshore energy reception in Viana Castle pilot zone" (Q2981132)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:0619:06, 3 August 2022DG Regio talk contribs 44,333 bytes +27,099 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:4708:47, 9 July 2021DG Regio talk contribs 9,637 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:3101:31, 9 July 2021DG Regio talk contribs 9,206 bytes +1,264 Created claim: summary (P836): The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid., trans...
  • curprev 01:3101:31, 9 July 2021DG Regio talk contribs 7,942 bytes −1,264 Removed claim: summary (P836): The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid., rem...
  • curprev 01:1301:13, 9 July 2021DG Regio talk contribs 9,206 bytes +147 Changed label, description and/or aliases in en: translated_label
  • curprev 01:1301:13, 9 July 2021DG Regio talk contribs 9,059 bytes +1,264 Created claim: summary (P836): The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid., trans...

8 July 2021

7 July 2021