Revision history of "Adaptation of Pipas Port to Ferries Operation – Terceira Island" (Q2913373)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

12 June 2023

23 May 2023

9 November 2022

30 July 2022

  • curprev 02:3302:33, 30 July 2022DG Regio talk contribs 43,215 bytes +26,188 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

14 December 2021

6 December 2021

22 October 2021

14 September 2021

8 July 2021

  • curprev 13:0813:08, 8 July 2021DG Regio talk contribs 9,466 bytes +124 Changed label, description and/or aliases in en: translated_label
  • curprev 13:0813:08, 8 July 2021DG Regio talk contribs 9,342 bytes +1,219 Created claim: summary (P836): The adaptation of the Port of Pipas to the ferry operation, estimated at EUR 14893910.05, aims to improve operational conditions, enhancing the safety and efficiency of port operations. It will enlarge the dock and a ro-ro ramp will be installed, facilitating flows of people, vehicles and assets, mitigating operational inefficiencies, congestion and the lack of safety due to weather conditions., translated_summary
  • curprev 10:3210:32, 8 July 2021DG Regio talk contribs 8,123 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021