Revision history of "North Line – Modernisation of the Ovar-Gaia section (2nd phase)" (Q2913358)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

23 May 2023

9 November 2022

30 July 2022

  • curprev 02:3202:32, 30 July 2022DG Regio talk contribs 41,101 bytes +25,715 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

14 December 2021

6 December 2021

22 October 2021

14 September 2021

8 July 2021

  • curprev 13:0613:06, 8 July 2021DG Regio talk contribs 8,182 bytes +124 Changed label, description and/or aliases in en: translated_label
  • curprev 13:0613:06, 8 July 2021DG Regio talk contribs 8,058 bytes +1,254 Created claim: summary (P836): The assistance covered by this application corresponds to the 2nd phase of modernisation of the Ovar-Gaia section, including the construction of level crossings, the complete renewal of the track between the PK 296+ 600 and the PK 332+ 780, the installation of electronic signalling systems, telecommunications and automatic speed control between the PK 299+ 885 and the PK 332+ 760 and the carrying out of studies and projects., translated_summary
  • curprev 10:3110:31, 8 July 2021DG Regio talk contribs 6,804 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

6 July 2021