Revision history of "Implementation of the Operationality of the Liquid Grannel Terminal" (Q2913355)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

12 June 2023

23 May 2023

9 November 2022

30 July 2022

  • curprev 02:3202:32, 30 July 2022DG Regio talk contribs 40,609 bytes +24,304 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

14 December 2021

6 December 2021

21 October 2021

14 September 2021

8 July 2021

  • curprev 13:0613:06, 8 July 2021DG Regio talk contribs 9,364 bytes +126 Changed label, description and/or aliases in en: translated_label
  • curprev 13:0613:06, 8 July 2021DG Regio talk contribs 9,238 bytes +1,187 Created claim: summary (P836): This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks., translated_summary
  • curprev 10:3110:31, 8 July 2021DG Regio talk contribs 8,051 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021