Revision history of "Basic School of Foz do Neiva, Castelo do Neiva, Viana do Castelo Fibrocimento Removal" (Q2899506)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:5518:55, 29 July 2022DG Regio talk contribs 39,706 bytes +23,580 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 08:1408:14, 8 July 2021DG Regio talk contribs 9,232 bytes +1,103 Created claim: summary (P836): Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover from the school building, according to environmental control and quality standards, with the subsequent placement of a thermal insulation roof and with gutters., translated_summary
  • curprev 08:1408:14, 8 July 2021DG Regio talk contribs 8,129 bytes −1,103 Removed claim: summary (P836): Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover from the school building, according to environmental control and quality standards, with the subsequent placement of a thermal insulation roof and with gutters., remove_old_english_translation
  • curprev 08:0408:04, 8 July 2021DG Regio talk contribs 9,232 bytes +144 Changed label, description and/or aliases in en: translated_label
  • curprev 08:0408:04, 8 July 2021DG Regio talk contribs 9,088 bytes +1,103 Created claim: summary (P836): Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover from the school building, according to environmental control and quality standards, with the subsequent placement of a thermal insulation roof and with gutters., translated_summary
  • curprev 01:3401:34, 8 July 2021DG Regio talk contribs 7,985 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021