Revision history of "Basic School Dr. Pedro Barbosa, Viana do Castelo Fibrocimento Removal" (Q2899504)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:5518:55, 29 July 2022DG Regio talk contribs 39,125 bytes +23,293 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 08:1408:14, 8 July 2021DG Regio talk contribs 9,168 bytes +1,092 Created claim: summary (P836): Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover, according to environmental control and quality standards, with the subsequent placement of a roof with thermal insulation and provided with gutters., translated_summary
  • curprev 08:1408:14, 8 July 2021DG Regio talk contribs 8,076 bytes −1,092 Removed claim: summary (P836): Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover, according to environmental control and quality standards, with the subsequent placement of a roof with thermal insulation and provided with gutters., remove_old_english_translation
  • curprev 08:0408:04, 8 July 2021DG Regio talk contribs 9,168 bytes +128 Changed label, description and/or aliases in en: translated_label
  • curprev 08:0408:04, 8 July 2021DG Regio talk contribs 9,040 bytes +1,092 Created claim: summary (P836): Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover, according to environmental control and quality standards, with the subsequent placement of a roof with thermal insulation and provided with gutters., translated_summary
  • curprev 01:3401:34, 8 July 2021DG Regio talk contribs 7,948 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021