Revision history of "Basic and Secondary School of Macedo of Knights – EB Rehabilitation 2.3/S" (Q2899395)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:5218:52, 29 July 2022DG Regio talk contribs 39,877 bytes +23,604 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 08:0508:05, 8 July 2021DG Regio talk contribs 9,306 bytes +1,119 Created claim: summary (P836): The proposed intervention involves intervention in general school equipment, with emphasis on the requalification of the roofs and the replacement of all external boxes, as well as the integral remodeling of the water supply networks and the partial requalification of the sewage drainage network., translated_summary
  • curprev 08:0508:05, 8 July 2021DG Regio talk contribs 8,187 bytes −1,119 Removed claim: summary (P836): The proposed intervention involves intervention in general school equipment, with emphasis on the requalification of the roofs and the replacement of all external boxes, as well as the integral remodeling of the water supply networks and the partial requalification of the sewage drainage network., remove_old_english_translation
  • curprev 08:0208:02, 8 July 2021DG Regio talk contribs 9,306 bytes +134 Changed label, description and/or aliases in en: translated_label
  • curprev 08:0208:02, 8 July 2021DG Regio talk contribs 9,172 bytes +1,119 Created claim: summary (P836): The proposed intervention involves intervention in general school equipment, with emphasis on the requalification of the roofs and the replacement of all external boxes, as well as the integral remodeling of the water supply networks and the partial requalification of the sewage drainage network., translated_summary
  • curprev 05:5505:55, 8 July 2021DG Regio talk contribs 8,053 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021