Revision history of "Requalification and Modernisation of the Alexandre Herculano Secondary School facilities" (Q2899347)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:5018:50, 29 July 2022DG Regio talk contribs 44,540 bytes +27,186 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 08:0408:04, 8 July 2021DG Regio talk contribs 9,581 bytes +1,292 Created claim: summary (P836): This project ensures the rehabilitation and modernisation of the building of the Alexandre Herculano Secondary School.The proposed solution keeps special attention to the historical value, assuming the elimination of buildings without architectural quality that were carried out.In this sense and respect for the original design, it is proposed to open, at the level of floor 0, all communication spans, also altered, between the galleries/corridors...
  • curprev 08:0408:04, 8 July 2021DG Regio talk contribs 8,289 bytes −1,292 Removed claim: summary (P836): This project ensures the rehabilitation and modernisation of the building of the Alexandre Herculano Secondary School.The proposed solution keeps special attention to the historical value, assuming the elimination of buildings without architectural quality that were carried out.In this sense and respect for the original design, it is proposed to open, at the level of floor 0, all communication spans, also altered, between the galleries/corrido...
  • curprev 08:0108:01, 8 July 2021DG Regio talk contribs 9,581 bytes +147 Changed label, description and/or aliases in en: translated_label
  • curprev 08:0108:01, 8 July 2021DG Regio talk contribs 9,434 bytes +1,292 Created claim: summary (P836): This project ensures the rehabilitation and modernisation of the building of the Alexandre Herculano Secondary School.The proposed solution keeps special attention to the historical value, assuming the elimination of buildings without architectural quality that were carried out.In this sense and respect for the original design, it is proposed to open, at the level of floor 0, all communication spans, also altered, between the galleries/corridors...
  • curprev 05:5505:55, 8 July 2021DG Regio talk contribs 8,142 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021