Revision history of "Requalification and Modernisation of the facilities of the Cerva Basic School, Ribeira de Pena" (Q2899326)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:5018:50, 29 July 2022DG Regio talk contribs 43,043 bytes +26,047 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 08:0208:02, 8 July 2021DG Regio talk contribs 9,528 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 08:0108:01, 8 July 2021DG Regio talk contribs 9,097 bytes +1,220 Created claim: summary (P836): This operation aims to replace the existing fibrocement cover, which at the moment poses a danger to the health of the community and the construction of walkways that connect the main building to the school pavilion in order to protect the students from the rain, together with this walkway will be built a shelter/stop in order to allow the students to exit and safely enter the school transports., translated_summary
  • curprev 08:0108:01, 8 July 2021DG Regio talk contribs 7,877 bytes −1,220 Removed claim: summary (P836): This operation aims to replace the existing fibrocement cover, which at the moment poses a danger to the health of the community and the construction of walkways that connect the main building to the school pavilion in order to protect the students from the rain, together with this walkway will be built a shelter/stop in order to allow the students to exit and safely enter the school transports., remove_old_english_translation
  • curprev 08:0008:00, 8 July 2021DG Regio talk contribs 9,097 bytes +153 Changed label, description and/or aliases in en: translated_label
  • curprev 08:0008:00, 8 July 2021DG Regio talk contribs 8,944 bytes +1,220 Created claim: summary (P836): This operation aims to replace the existing fibrocement cover, which at the moment poses a danger to the health of the community and the construction of walkways that connect the main building to the school pavilion in order to protect the students from the rain, together with this walkway will be built a shelter/stop in order to allow the students to exit and safely enter the school transports., translated_summary

7 July 2021

6 July 2021