Revision history of "“Enlargement and Requalification of the Júlio Saúl Dias Basic School” – Vila do Conde" (Q2899267)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:4818:48, 29 July 2022DG Regio talk contribs 40,041 bytes +23,866 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 08:0208:02, 8 July 2021DG Regio talk contribs 9,285 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 08:0008:00, 8 July 2021DG Regio talk contribs 8,854 bytes +1,112 Created claim: summary (P836): The expansion and requalification of EB Júlio Saúl Dias has as main objectives the improvement of teaching/learning conditions, comfort and safety, the integration of various levels of education and the closure of educational establishments installed in prefabricated and small buildings., translated_summary
  • curprev 08:0008:00, 8 July 2021DG Regio talk contribs 7,742 bytes −1,112 Removed claim: summary (P836): The expansion and requalification of EB Júlio Saúl Dias has as main objectives the improvement of teaching/learning conditions, comfort and safety, the integration of various levels of education and the closure of educational establishments installed in prefabricated and small buildings., remove_old_english_translation
  • curprev 07:5907:59, 8 July 2021DG Regio talk contribs 8,854 bytes +152 Changed label, description and/or aliases in en: translated_label
  • curprev 07:5907:59, 8 July 2021DG Regio talk contribs 8,702 bytes +1,112 Created claim: summary (P836): The expansion and requalification of EB Júlio Saúl Dias has as main objectives the improvement of teaching/learning conditions, comfort and safety, the integration of various levels of education and the closure of educational establishments installed in prefabricated and small buildings., translated_summary

7 July 2021

6 July 2021