Revision history of "Basic School of Vila Flor" (Q2899225)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:4718:47, 29 July 2022DG Regio talk contribs 41,973 bytes +25,241 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 08:0408:04, 8 July 2021DG Regio talk contribs 9,427 bytes +1,229 Created claim: summary (P836): The project consists of the refurbishment/requalification of an existing building. The two types of teaching, preschool and 1ºCEB will be installed in autonomous buildings, but integrated in the same school, sharing the interior spaces and equipment for physical and leisure activities, patios, gardens and green spaces, park area, walkways, staircases and parking areas for children’s entrance and exit., translated_summary
  • curprev 08:0408:04, 8 July 2021DG Regio talk contribs 8,198 bytes −1,229 Removed claim: summary (P836): The project consists of the refurbishment/requalification of an existing building. The two types of teaching, preschool and 1ºCEB will be installed in autonomous buildings, but integrated in the same school, sharing the interior spaces and equipment for physical and leisure activities, patios, gardens and green spaces, park area, walkways, staircases and parking areas for children’s entrance and exit., remove_old_english_translation
  • curprev 07:5907:59, 8 July 2021DG Regio talk contribs 9,427 bytes +84 Changed label, description and/or aliases in en: translated_label
  • curprev 07:5907:59, 8 July 2021DG Regio talk contribs 9,343 bytes +1,229 Created claim: summary (P836): The project consists of the refurbishment/requalification of an existing building. The two types of teaching, preschool and 1ºCEB will be installed in autonomous buildings, but integrated in the same school, sharing the interior spaces and equipment for physical and leisure activities, patios, gardens and green spaces, park area, walkways, staircases and parking areas for children’s entrance and exit., translated_summary
  • curprev 01:3001:30, 8 July 2021DG Regio talk contribs 8,114 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021