Revision history of "PLANOS INTEGRADOS E INOVADORES DE COMBATE AO INSUCESSO ESCOLAR - PROJETOS" (Q2898986)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:4018:40, 29 July 2022DG Regio talk contribs 44,531 bytes +27,265 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

4 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:5607:56, 8 July 2021DG Regio talk contribs 9,386 bytes +1,260 Created claim: summary (P836): The Operation School 4 All – Viana do Castelo, integrated in the typology: Reducing the school dropout, its primary objective is to contribute to the improvement of the educational success of students, reducing early exits from the educational system, combating school failure (retention and withdrawal rate), reinforcing equity in access to education and improving the quality and relevance of students’ learning and acquired skills., translated_su...
  • curprev 05:5305:53, 8 July 2021DG Regio talk contribs 8,126 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021