Revision history of "Requalifying/remodeling the facilities of the Elderly Home – ERPI (Residential Structure for Elderly People), of the Social and Parochial Center of S. Miguel de Lobrigos" (Q2898345)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 18:2218:22, 29 July 2022DG Regio talk contribs 46,213 bytes +28,348 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 08:0108:01, 8 July 2021DG Regio talk contribs 9,814 bytes +1,256 Created claim: summary (P836): The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users., translated_su...
  • curprev 08:0108:01, 8 July 2021DG Regio talk contribs 8,558 bytes −1,256 Removed claim: summary (P836): The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users., remove_old_...
  • curprev 07:4807:48, 8 July 2021DG Regio talk contribs 9,814 bytes +231 Changed label, description and/or aliases in en: translated_label
  • curprev 07:4807:48, 8 July 2021DG Regio talk contribs 9,583 bytes +1,256 Created claim: summary (P836): The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users., translated_su...
  • curprev 01:3201:32, 8 July 2021DG Regio talk contribs 8,327 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021