Revision history of "Rehabilitation of the Housing Building of the Municipality of the Siege of Porto-1ª. Phase" (Q2895792)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 17:0817:08, 29 July 2022DG Regio talk contribs 42,683 bytes +25,737 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:0807:08, 8 July 2021DG Regio talk contribs 9,528 bytes +150 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0807:08, 8 July 2021DG Regio talk contribs 9,378 bytes +1,254 Created claim: summary (P836): With the aim of improving the habitability and comfort conditions of residents, the operation includes the rehabilitation of Buildings 4, 11, 12, 14, 15, 18, 23, 25, 27, 28 and 29 of the Siege of Porto, in a set of 286 dwellings, and buildings 1, 2 and 3, in a set of 72 dwellings. Rehabilitation is aimed at the different construction elements, namely elements associated with the outer envelope and, on time, indoor installations., translated_summary
  • curprev 00:4700:47, 8 July 2021DG Regio talk contribs 8,124 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021