Revision history of "Rehabilitation and refunctionalisation of the facilities of the former Trofa Railway Station" (Q2895643)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 17:0417:04, 29 July 2022DG Regio talk contribs 43,702 bytes +26,641 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:2107:21, 8 July 2021DG Regio talk contribs 9,585 bytes +1,264 Created claim: summary (P836): The present operation consists of the complete rehabilitation of the facilities where the Trofa Railway Station previously operated, discarded and in increasing degradation since the deactivation and consequent dismantling of the old Minho Line, thus enhancing the reincorporation of this area into the urban fabric of the city and the leverage of new dynamics of physical, economic and social regeneration in its most immediate surroundings., trans...
  • curprev 07:2107:21, 8 July 2021DG Regio talk contribs 8,321 bytes −1,264 Removed claim: summary (P836): The present operation consists of the complete rehabilitation of the facilities where the Trofa Railway Station previously operated, discarded and in increasing degradation since the deactivation and consequent dismantling of the old Minho Line, thus enhancing the reincorporation of this area into the urban fabric of the city and the leverage of new dynamics of physical, economic and social regeneration in its most immediate surroundings., rem...
  • curprev 07:0607:06, 8 July 2021DG Regio talk contribs 9,585 bytes +151 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0607:06, 8 July 2021DG Regio talk contribs 9,434 bytes +1,264 Created claim: summary (P836): The present operation consists of the complete rehabilitation of the facilities where the Trofa Railway Station previously operated, discarded and in increasing degradation since the deactivation and consequent dismantling of the old Minho Line, thus enhancing the reincorporation of this area into the urban fabric of the city and the leverage of new dynamics of physical, economic and social regeneration in its most immediate surroundings., trans...
  • curprev 00:4900:49, 8 July 2021DG Regio talk contribs 8,170 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021