Revision history of "Lourinha Interface – Rio Tinto" (Q2895580)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 November 2022

29 July 2022

  • curprev 17:0217:02, 29 July 2022DG Regio talk contribs 42,896 bytes +26,127 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:2007:20, 8 July 2021DG Regio talk contribs 9,426 bytes +1,259 Created claim: summary (P836): The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops., translated...
  • curprev 07:2007:20, 8 July 2021DG Regio talk contribs 8,167 bytes −1,259 Removed claim: summary (P836): The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops., remove_o...
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,426 bytes +91 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,335 bytes +1,259 Created claim: summary (P836): The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops., translated...
  • curprev 00:4600:46, 8 July 2021DG Regio talk contribs 8,076 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021