Revision history of "Oliveira de Azeméis Multimodal Transport Station" (Q2895579)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 17:0217:02, 29 July 2022DG Regio talk contribs 41,222 bytes +24,754 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:2007:20, 8 July 2021DG Regio talk contribs 9,433 bytes +1,179 Created claim: summary (P836): This operation aims to restructure the municipal market building. Construction will be carried out in the current building of the market, transforming it on the two lower floors in a multimodal transport station and on the last floor the municipal market remains. This will create excellent conditions for promoting the use of public transport and bicycles., translated_summary
  • curprev 07:2007:20, 8 July 2021DG Regio talk contribs 8,254 bytes −1,179 Removed claim: summary (P836): This operation aims to restructure the municipal market building. Construction will be carried out in the current building of the market, transforming it on the two lower floors in a multimodal transport station and on the last floor the municipal market remains. This will create excellent conditions for promoting the use of public transport and bicycles., remove_old_english_translation
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,433 bytes +108 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,325 bytes +1,179 Created claim: summary (P836): This operation aims to restructure the municipal market building. Construction will be carried out in the current building of the market, transforming it on the two lower floors in a multimodal transport station and on the last floor the municipal market remains. This will create excellent conditions for promoting the use of public transport and bicycles., translated_summary
  • curprev 00:4600:46, 8 July 2021DG Regio talk contribs 8,146 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021