Revision history of "Pamus 4 – Interface of Mirandela railway station (floor floor)" (Q2895568)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 17:0017:00, 29 July 2022DG Regio talk contribs 42,148 bytes +25,491 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:2007:20, 8 July 2021DG Regio talk contribs 9,416 bytes +1,226 Created claim: summary (P836): The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface., translated_summary
  • curprev 07:2007:20, 8 July 2021DG Regio talk contribs 8,190 bytes −1,226 Removed claim: summary (P836): The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface., remove_old_english_translation
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,416 bytes +123 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,293 bytes +1,226 Created claim: summary (P836): The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface., translated_summary
  • curprev 00:4500:45, 8 July 2021DG Regio talk contribs 8,067 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021