Revision history of "Requalification of the 19th Street – pedestrian" (Q2895557)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 17:0017:00, 29 July 2022DG Regio talk contribs 42,755 bytes +25,906 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:1907:19, 8 July 2021DG Regio talk contribs 9,462 bytes +1,275 Created claim: summary (P836): It aims to requalify the pedestrian section of 19th Street, the main street of the city and pedestrian of excellence, which connects the square of the county, the Parque João de Deus, with the pedestrian space of the Railway Canal (surface) target of the ongoing intervention (ReCaFE), the walk of Beira-Mar and the av Maia Brenha. It includes restoring the pedestrian area, replacing public lighting, infrastructure, urban furniture and afforestati...
  • curprev 07:1907:19, 8 July 2021DG Regio talk contribs 8,187 bytes −1,275 Removed claim: summary (P836): It aims to requalify the pedestrian section of 19th Street, the main street of the city and pedestrian of excellence, which connects the square of the county, the Parque João de Deus, with the pedestrian space of the Railway Canal (surface) target of the ongoing intervention (ReCaFE), the walk of Beira-Mar and the av Maia Brenha. It includes restoring the pedestrian area, replacing public lighting, infrastructure, urban furniture and afforesta...
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,462 bytes +108 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,354 bytes +1,275 Created claim: summary (P836): It aims to requalify the pedestrian section of 19th Street, the main street of the city and pedestrian of excellence, which connects the square of the county, the Parque João de Deus, with the pedestrian space of the Railway Canal (surface) target of the ongoing intervention (ReCaFE), the walk of Beira-Mar and the av Maia Brenha. It includes restoring the pedestrian area, replacing public lighting, infrastructure, urban furniture and afforestati...
  • curprev 00:4500:45, 8 July 2021DG Regio talk contribs 8,079 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021