Revision history of "Access in soft modes to the centre of Resumil – Fermêdo" (Q2895481)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 16:5816:58, 29 July 2022DG Regio talk contribs 40,547 bytes +24,466 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:0407:04, 8 July 2021DG Regio talk contribs 9,269 bytes +117 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0407:04, 8 July 2021DG Regio talk contribs 9,152 bytes +1,162 Created claim: summary (P836): With this infrastructural character operation, it is intended to improve the accessibility conditions in the central area of Resumil-Fermedo through the increase of smooth modes and the creation of an alternative route, by redefining the carriageway due to the introduction of walks with conditions to be shared by pedestrians and bicycles., translated_summary
  • curprev 00:4200:42, 8 July 2021DG Regio talk contribs 7,990 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021