Revision history of "Pedestrian route and cyclable to the core of Macieira de Cambra" (Q2895469)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 16:5816:58, 29 July 2022DG Regio talk contribs 42,102 bytes +25,704 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:0407:04, 8 July 2021DG Regio talk contribs 9,407 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0407:04, 8 July 2021DG Regio talk contribs 9,285 bytes +1,224 Created claim: summary (P836): The object of this project is the construction of a link between Macieira de Cambra and the school center of Búzio safe for pedestrians and cyclist, contributing to a more sustainable and inclusive mobility. It is proposed, for roads with the highest volume of traffic, to re-allocation the channel space and to encourage the use of public transport and smooth modes of travel in individual transport., translated_summary
  • curprev 00:4200:42, 8 July 2021DG Regio talk contribs 8,061 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021