Revision history of "Improvement of the conditions of coexistence of soft modes, which may require the elimination of accident accumulation points between pedestrians and cyclists, in the urban core of Pedrouços" (Q2895412)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 November 2022

29 July 2022

  • curprev 16:5716:57, 29 July 2022DG Regio talk contribs 43,053 bytes +26,157 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:1907:19, 8 July 2021DG Regio talk contribs 9,454 bytes +1,108 Created claim: summary (P836): The project comprises:Project execution, preparatory activities and advice directly linked to the operation, including the elaboration of the Cost-Benefit Analysis, where applicableConstruction work and other engineering workFiscalisation, security coordination and technical assistance, translated_summary
  • curprev 07:1907:19, 8 July 2021DG Regio talk contribs 8,346 bytes −1,108 Removed claim: summary (P836): The project comprises:Project execution, preparatory activities and advice directly linked to the operation, including the elaboration of the Cost-Benefit Analysis, where applicableConstruction work and other engineering workFiscalisation, security coordination and technical assistance, remove_old_english_translation
  • curprev 07:0307:03, 8 July 2021DG Regio talk contribs 9,454 bytes +251 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0307:03, 8 July 2021DG Regio talk contribs 9,203 bytes +1,108 Created claim: summary (P836): The project comprises:Project execution, preparatory activities and advice directly linked to the operation, including the elaboration of the Cost-Benefit Analysis, where applicableConstruction work and other engineering workFiscalisation, security coordination and technical assistance, translated_summary
  • curprev 00:4400:44, 8 July 2021DG Regio talk contribs 8,095 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021