Revision history of "Requalification of the Railway Channel – Cyclovia and Intermodal Platform Construction" (Q2895391)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 16:5616:56, 29 July 2022DG Regio talk contribs 44,191 bytes +27,085 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:1807:18, 8 July 2021DG Regio talk contribs 9,532 bytes +1,252 Created claim: summary (P836): The operation aims to provide the urban centre with sustainable urban mobility conditions, in a central and primordial area of the city the Railway Canal Space to the Surface resulting from the burial of the North Line. To this end, it includes the construction of a bicycle path, which will be part of a wider network and an intermodal platform, consisting of a stop zone and bus park, including the creation of micro-interfaces., translated_summary
  • curprev 07:1807:18, 8 July 2021DG Regio talk contribs 8,280 bytes −1,252 Removed claim: summary (P836): The operation aims to provide the urban centre with sustainable urban mobility conditions, in a central and primordial area of the city the Railway Canal Space to the Surface resulting from the burial of the North Line. To this end, it includes the construction of a bicycle path, which will be part of a wider network and an intermodal platform, consisting of a stop zone and bus park, including the creation of micro-interfaces., remove_old_engl...
  • curprev 07:0307:03, 8 July 2021DG Regio talk contribs 9,532 bytes +147 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0307:03, 8 July 2021DG Regio talk contribs 9,385 bytes +1,252 Created claim: summary (P836): The operation aims to provide the urban centre with sustainable urban mobility conditions, in a central and primordial area of the city the Railway Canal Space to the Surface resulting from the burial of the North Line. To this end, it includes the construction of a bicycle path, which will be part of a wider network and an intermodal platform, consisting of a stop zone and bus park, including the creation of micro-interfaces., translated_summary
  • curprev 00:4300:43, 8 July 2021DG Regio talk contribs 8,133 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021