Revision history of "Via Panoramic and Requalification of Rua Oliveira Salazar" (Q2895360)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 16:5516:55, 29 July 2022DG Regio talk contribs 42,342 bytes +25,558 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:1807:18, 8 July 2021DG Regio talk contribs 9,523 bytes +1,254 Created claim: summary (P836): The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory., translated_summary
  • curprev 07:1807:18, 8 July 2021DG Regio talk contribs 8,269 bytes −1,254 Removed claim: summary (P836): The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory., remove_old_en...
  • curprev 07:0207:02, 8 July 2021DG Regio talk contribs 9,523 bytes +116 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0207:02, 8 July 2021DG Regio talk contribs 9,407 bytes +1,254 Created claim: summary (P836): The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory., translated_summary
  • curprev 00:4300:43, 8 July 2021DG Regio talk contribs 8,153 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021