Revision history of "URBAN CORRIDOR STRUCTURING – RUA JOSÉ REGIO" (Q2895359)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 16:5516:55, 29 July 2022DG Regio talk contribs 42,191 bytes +25,370 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:1807:18, 8 July 2021DG Regio talk contribs 9,468 bytes +1,214 Created claim: summary (P836): The planned intervention will allow Rua José Régio to act as a complement to the urban road network in order to allow significant improvements to the circulation scheme near the school area, the Truck Center, peripheral parks and main road access to the city, with the introduction of solutions to ensure the flow of traffic and the circulation of alternative and smooth modes of transport., translated_summary
  • curprev 07:1807:18, 8 July 2021DG Regio talk contribs 8,254 bytes −1,214 Removed claim: summary (P836): The planned intervention will allow Rua José Régio to act as a complement to the urban road network in order to allow significant improvements to the circulation scheme near the school area, the Truck Center, peripheral parks and main road access to the city, with the introduction of solutions to ensure the flow of traffic and the circulation of alternative and smooth modes of transport., remove_old_english_translation
  • curprev 07:0207:02, 8 July 2021DG Regio talk contribs 9,468 bytes +105 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0207:02, 8 July 2021DG Regio talk contribs 9,363 bytes +1,214 Created claim: summary (P836): The planned intervention will allow Rua José Régio to act as a complement to the urban road network in order to allow significant improvements to the circulation scheme near the school area, the Truck Center, peripheral parks and main road access to the city, with the introduction of solutions to ensure the flow of traffic and the circulation of alternative and smooth modes of transport., translated_summary
  • curprev 00:4300:43, 8 July 2021DG Regio talk contribs 8,149 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021