Revision history of "IMPROVEMENT OF THE SURROUNDINGS OF ST. PETER’S CHURCH" (Q2895308)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 16:5416:54, 29 July 2022DG Regio talk contribs 39,704 bytes +23,567 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:1707:17, 8 July 2021DG Regio talk contribs 9,307 bytes +1,135 Created claim: summary (P836): This action briefly aims at requalifying the public space with improvements in the conditions of connection between the Church and Cemetery of Cerva as well as improving accessibility through the introduction of solutions that promote the movement and permanence of people in the enclosure and surrounding spaces., translated_summary
  • curprev 07:1607:16, 8 July 2021DG Regio talk contribs 8,172 bytes −1,135 Removed claim: summary (P836): This action briefly aims at requalifying the public space with improvements in the conditions of connection between the Church and Cemetery of Cerva as well as improving accessibility through the introduction of solutions that promote the movement and permanence of people in the enclosure and surrounding spaces., remove_old_english_translation
  • curprev 07:0107:01, 8 July 2021DG Regio talk contribs 9,307 bytes +114 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0107:01, 8 July 2021DG Regio talk contribs 9,193 bytes +1,135 Created claim: summary (P836): This action briefly aims at requalifying the public space with improvements in the conditions of connection between the Church and Cemetery of Cerva as well as improving accessibility through the introduction of solutions that promote the movement and permanence of people in the enclosure and surrounding spaces., translated_summary
  • curprev 00:4200:42, 8 July 2021DG Regio talk contribs 8,058 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021