Revision history of "Resende Municipal Center of Civil Protection" (Q2894926)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 16:4516:45, 29 July 2022DG Regio talk contribs 40,527 bytes +24,329 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 9,245 bytes +1,160 Created claim: summary (P836): The operation includes 4 actions that intend to achieve the objectives described in the previous point and detailed in the descriptive memory.1 – Physical Remodeling of Municipal Workshops 2 – Supply of Office Furniture 3 – Supply of Equipment and Technological Resources 4 – Supply of equipment for SIRESP, ROB and REPC networks., translated_summary
  • curprev 07:0507:05, 8 July 2021DG Regio talk contribs 8,085 bytes −1,160 Removed claim: summary (P836): The operation includes 4 actions that intend to achieve the objectives described in the previous point and detailed in the descriptive memory.1 – Physical Remodeling of Municipal Workshops 2 – Supply of Office Furniture 3 – Supply of Equipment and Technological Resources 4 – Supply of equipment for SIRESP, ROB and REPC networks., remove_old_english_translation
  • curprev 06:5606:56, 8 July 2021DG Regio talk contribs 9,245 bytes +103 Changed label, description and/or aliases in en: translated_label
  • curprev 06:5606:56, 8 July 2021DG Regio talk contribs 9,142 bytes +1,160 Created claim: summary (P836): The operation includes 4 actions that intend to achieve the objectives described in the previous point and detailed in the descriptive memory.1 – Physical Remodeling of Municipal Workshops 2 – Supply of Office Furniture 3 – Supply of Equipment and Technological Resources 4 – Supply of equipment for SIRESP, ROB and REPC networks., translated_summary
  • curprev 00:3600:36, 8 July 2021DG Regio talk contribs 7,982 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021