Revision history of "MURÇA INTERFACE" (Q2894742)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 16:4116:41, 29 July 2022DG Regio talk contribs 41,066 bytes +24,726 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:0307:03, 8 July 2021DG Regio talk contribs 9,295 bytes +1,197 Created claim: summary (P836): The INTERFACE DE Murça equipment, as a whole, is characterised by a large metal cover that houses people and buses parked in an open space that opens to the outside to introduce light and natural ventilation, and a closed building to support passengers with only one floor that develops in an orthogonal way above the threshold quota. The cover as permanently covered space., translated_summary
  • curprev 07:0307:03, 8 July 2021DG Regio talk contribs 8,098 bytes −1,197 Removed claim: summary (P836): The INTERFACE DE Murça equipment, as a whole, is characterised by a large metal cover that houses people and buses parked in an open space that opens to the outside to introduce light and natural ventilation, and a closed building to support passengers with only one floor that develops in an orthogonal way above the threshold quota. The cover as permanently covered space., remove_old_english_translation
  • curprev 06:5406:54, 8 July 2021DG Regio talk contribs 9,295 bytes +75 Changed label, description and/or aliases in en: translated_label
  • curprev 06:5406:54, 8 July 2021DG Regio talk contribs 9,220 bytes +1,197 Created claim: summary (P836): The INTERFACE DE Murça equipment, as a whole, is characterised by a large metal cover that houses people and buses parked in an open space that opens to the outside to introduce light and natural ventilation, and a closed building to support passengers with only one floor that develops in an orthogonal way above the threshold quota. The cover as permanently covered space., translated_summary
  • curprev 00:2700:27, 8 July 2021DG Regio talk contribs 8,023 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021