Revision history of "Urban Mobility in the Municipality of Vila Nova de Foz Côa" (Q2894684)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 16:3916:39, 29 July 2022DG Regio talk contribs 42,741 bytes +25,818 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:0807:08, 8 July 2021DG Regio talk contribs 9,475 bytes +1,256 Created claim: summary (P836): This operation consists on the one hand of the construction of a pedestrian road in the village of Touça in order to improve pedestrian traffic conditions by optimising the conditions of comfort and safety in this specific area and the improvement of the public transport interface network with the purchase and placement of 16 new shelters and the requalification of 18 existing in a total of 34, at bus stops throughout the county., translated_sum...
  • curprev 07:0807:08, 8 July 2021DG Regio talk contribs 8,219 bytes −1,256 Removed claim: summary (P836): This operation consists on the one hand of the construction of a pedestrian road in the village of Touça in order to improve pedestrian traffic conditions by optimising the conditions of comfort and safety in this specific area and the improvement of the public transport interface network with the purchase and placement of 16 new shelters and the requalification of 18 existing in a total of 34, at bus stops throughout the county., remove_old_e...
  • curprev 06:5306:53, 8 July 2021DG Regio talk contribs 9,475 bytes +118 Changed label, description and/or aliases in en: translated_label
  • curprev 06:5306:53, 8 July 2021DG Regio talk contribs 9,357 bytes +1,256 Created claim: summary (P836): This operation consists on the one hand of the construction of a pedestrian road in the village of Touça in order to improve pedestrian traffic conditions by optimising the conditions of comfort and safety in this specific area and the improvement of the public transport interface network with the purchase and placement of 16 new shelters and the requalification of 18 existing in a total of 34, at bus stops throughout the county., translated_sum...
  • curprev 00:2000:20, 8 July 2021DG Regio talk contribs 8,101 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021