Revision history of "Increased energy efficiency in the building of the Paços do Concelho da Póvoa de Lanhoso" (Q2894520)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 16:3616:36, 29 July 2022DG Regio talk contribs 44,483 bytes +27,228 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 06:5906:59, 8 July 2021DG Regio talk contribs 9,628 bytes +1,281 Created claim: summary (P836): The operation consists of 2 components, divided into 5 actions, 4 of i) studies, opinions, projects and advice and 1 of (ii) various constructions. The performance of the audit and the preparation of the implementation project were essential for the diagnosis and definition of the infrastructure intervention to be developed. The latter will make it possible to implement the solutions defined in the project and thus rationalise building energy co...
  • curprev 06:5906:59, 8 July 2021DG Regio talk contribs 8,347 bytes −1,281 Removed claim: summary (P836): The operation consists of 2 components, divided into 5 actions, 4 of i) studies, opinions, projects and advice and 1 of (ii) various constructions. The performance of the audit and the preparation of the implementation project were essential for the diagnosis and definition of the infrastructure intervention to be developed. The latter will make it possible to implement the solutions defined in the project and thus rationalise building energy...
  • curprev 06:5106:51, 8 July 2021DG Regio talk contribs 9,628 bytes +149 Changed label, description and/or aliases in en: translated_label
  • curprev 06:5106:51, 8 July 2021DG Regio talk contribs 9,479 bytes +1,281 Created claim: summary (P836): The operation consists of 2 components, divided into 5 actions, 4 of i) studies, opinions, projects and advice and 1 of (ii) various constructions. The performance of the audit and the preparation of the implementation project were essential for the diagnosis and definition of the infrastructure intervention to be developed. The latter will make it possible to implement the solutions defined in the project and thus rationalise building energy co...
  • curprev 00:2200:22, 8 July 2021DG Regio talk contribs 8,198 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021