Revision history of "Promotion of Energy Efficiency in Penafiel Municipal Pools" (Q2894518)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 16:3616:36, 29 July 2022DG Regio talk contribs 40,219 bytes +24,090 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 06:5906:59, 8 July 2021DG Regio talk contribs 9,219 bytes +1,134 Created claim: summary (P836): The implementation of the proposed improvement measures at the same time presents a total investment of EUR 903 336.44 for a reduction in operating costs of EUR 101,3338.00/year. The final result of these measures is an increase in the efficiency of the installation and the energy classification achieved is A+., translated_summary
  • curprev 06:5906:59, 8 July 2021DG Regio talk contribs 8,085 bytes −1,134 Removed claim: summary (P836): The implementation of the proposed improvement measures at the same time presents a total investment of EUR 903 336.44 for a reduction in operating costs of EUR 101,3338.00/year. The final result of these measures is an increase in the efficiency of the installation and the energy classification achieved is A+., remove_old_english_translation
  • curprev 06:5106:51, 8 July 2021DG Regio talk contribs 9,219 bytes +117 Changed label, description and/or aliases in en: translated_label
  • curprev 06:5106:51, 8 July 2021DG Regio talk contribs 9,102 bytes +1,134 Created claim: summary (P836): The implementation of the proposed improvement measures at the same time presents a total investment of EUR 903 336.44 for a reduction in operating costs of EUR 101,3338.00/year. The final result of these measures is an increase in the efficiency of the installation and the energy classification achieved is A+., translated_summary
  • curprev 00:2200:22, 8 July 2021DG Regio talk contribs 7,968 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021