Revision history of "Construction of the Rapid Via Lobos Chamber/Wolves Chamber Strait" (Q2883678)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

11 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 11:0111:01, 29 July 2022DG Regio talk contribs 41,218 bytes +24,723 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

22 October 2021

13 September 2021

7 July 2021

  • curprev 22:4322:43, 7 July 2021DG Regio talk contribs 9,425 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 12:3212:32, 7 July 2021DG Regio talk contribs 8,994 bytes +124 Changed label, description and/or aliases in en: translated_label
  • curprev 12:3212:32, 7 July 2021DG Regio talk contribs 8,870 bytes +1,190 Created claim: summary (P836): The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets, translated_summary

6 July 2021