Revision history of "C4. Upgrading of the low and commercial area of Águas de Moura and EN5 connection" (Q2882342)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

11 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 10:2910:29, 29 July 2022DG Regio talk contribs 41,623 bytes +25,040 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:4721:47, 7 July 2021DG Regio talk contribs 9,444 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 11:5211:52, 7 July 2021DG Regio talk contribs 9,013 bytes +141 Changed label, description and/or aliases in en: translated_label
  • curprev 11:5211:52, 7 July 2021DG Regio talk contribs 8,872 bytes +1,197 Created claim: summary (P836): The purpose of the operation is the creation of accessible corridors and the elimination of architectural barriers on Gulbenkian Foundation Street, as well as a promotional action that stimulates the local commerce existing in the Águas de Moura cluster, namely Avenida da Liberdade (also known as Estrada Regional 5), in a logic of entrepreneurship and equal opportunities., translated_summary
  • curprev 00:0000:00, 7 July 2021DG Regio talk contribs 7,675 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates

6 July 2021