Revision history of "Upgrading network infrastructure and resource center update" (Q2882155)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

11 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 10:2410:24, 29 July 2022DG Regio talk contribs 40,659 bytes +24,346 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:4521:45, 7 July 2021DG Regio talk contribs 9,361 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 11:5011:50, 7 July 2021DG Regio talk contribs 8,930 bytes +118 Changed label, description and/or aliases in en: translated_label
  • curprev 11:5011:50, 7 July 2021DG Regio talk contribs 8,812 bytes +1,149 Created claim: summary (P836): This operation consists of the acquisition of the following elements: .. Two network switches with 10GBit data transmission capacity and fiber optic interconnection modules. Ten network switches with a capacity of 1GBit and the possibility of uplinking to 10GBit. Ten personal computers. Two projectors. 20 RAM memories 4G DDR3, translated_summary

6 July 2021