Revision history of "Replacement of asbestos coverings – Trafaria Basic School No. 3" (Q2882082)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

11 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 10:2210:22, 29 July 2022DG Regio talk contribs 42,378 bytes +25,525 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:3221:32, 7 July 2021DG Regio talk contribs 9,478 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 11:4911:49, 7 July 2021DG Regio talk contribs 9,047 bytes +124 Changed label, description and/or aliases in en: translated_label
  • curprev 11:4911:49, 7 July 2021DG Regio talk contribs 8,923 bytes +1,224 Created claim: summary (P836): This application refers to Basic School No. 3 Trafaria which is an educational establishment with 1st cycle and kindergarten It is attended in this academic year 2020/2021 for 5 maltas 1st cycle and 4 of pre-school education for a total of 196 students. The area covered by the operation in this school is 1,031 m² of fibrocement coverage, which means 2.1 % of the area of the 15 schools to intervene., translated_summary

6 July 2021