Revision history of "Replacement of roofs with asbestos – Secondary School of Cacilhas-Tejo" (Q2882074)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

11 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 10:2210:22, 29 July 2022DG Regio talk contribs 41,636 bytes +24,996 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:3221:32, 7 July 2021DG Regio talk contribs 9,483 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 11:4911:49, 7 July 2021DG Regio talk contribs 9,052 bytes +131 Changed label, description and/or aliases in en: translated_label
  • curprev 11:4911:49, 7 July 2021DG Regio talk contribs 8,921 bytes +1,202 Created claim: summary (P836): The application refers to the Cacilhas-Tejo Secondary School is a secondary school only attended by a total of 968 students distributed among 37 maltas.In regard to the area covered by the operation, this school will have 3,640 m² of interventional/replaced fibrocement coverage covering the entire building and which means 7.3 % of the total area of the 15 schools to intervene., translated_summary

6 July 2021