Revision history of "Replacement of asbestos roofs – Escola Básica D. António da Costa" (Q2882070)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

11 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 10:2210:22, 29 July 2022DG Regio talk contribs 41,759 bytes +25,314 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:3121:31, 7 July 2021DG Regio talk contribs 9,462 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 11:4911:49, 7 July 2021DG Regio talk contribs 9,031 bytes +128 Changed label, description and/or aliases in en: translated_label
  • curprev 11:4911:49, 7 July 2021DG Regio talk contribs 8,903 bytes +1,210 Created claim: summary (P836): The application refers to the Basic School D. António da Costa, which is a basic educational establishment with capacity for 50 maltas, attended by a total of 1,017 students With regard to the area covered by the operation, this school will have 2,620 m² of interventional/replaced fibrocement coverage, which means 5.2 % of the total area of the 15 schools that will have intervention., translated_summary

6 July 2021