Revision history of "Replacement of asbestos roofs – Daniel Sampaio Secondary School, Sobreda" (Q2882063)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

11 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 10:2110:21, 29 July 2022DG Regio talk contribs 41,368 bytes +24,814 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:3121:31, 7 July 2021DG Regio talk contribs 9,393 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 11:4111:41, 7 July 2021DG Regio talk contribs 8,962 bytes +133 Changed label, description and/or aliases in en: translated_label
  • curprev 11:4111:41, 7 July 2021DG Regio talk contribs 8,829 bytes +1,180 Created claim: summary (P836): The application refers to the Daniel Sampaio Secondary School which is an educational establishment with secondary and 3rd cycle of primary education attended in the academic year 2020/2021 by 1,043 students. The area covered by the operation in this school is 5,230 m² of fibrocement coverage, which means 10.4 % of the area of the 15 schools to intervene., translated_summary

6 July 2021