Revision history of "Requalification of the School Park – 2nd Phase" (Q2881910)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

11 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 10:1810:18, 29 July 2022DG Regio talk contribs 40,209 bytes +24,054 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:3321:33, 7 July 2021DG Regio talk contribs 9,367 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 11:3911:39, 7 July 2021DG Regio talk contribs 8,936 bytes +107 Changed label, description and/or aliases in en: translated_label
  • curprev 11:3911:39, 7 July 2021DG Regio talk contribs 8,829 bytes +1,165 Created claim: summary (P836): Considering the reality of the Municipal School Park, it is essential to carry out interventions in the level of infrastructure rehabilitation, the repair of infiltrations, cracks, ceiling and wall paintings, the remodeling of kitchens and cafeterias as well as sanitary facilities and the requalification of outdoor spaces and playing fields., translated_summary

6 July 2021