Revision history of "Improvement of Energy Efficiency of the Basic School of the 2nd and 3rd Cycle, José Cardoso Pires" (Q2880609)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

11 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 09:4609:46, 29 July 2022DG Regio talk contribs 43,846 bytes +26,602 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:3521:35, 7 July 2021DG Regio talk contribs 9,552 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 10:5610:56, 7 July 2021DG Regio talk contribs 9,121 bytes +157 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5610:56, 7 July 2021DG Regio talk contribs 8,964 bytes +1,225 Created claim: summary (P836): Implementation of energy performance improvement measures in EB 2, 3 José Cardoso Pires: Replacement of T8 tubular fluorescent lighting with more efficient LED solutions installation of solar thermal systems and photovoltaic solar system removal of asbestos cover and replacement by sandwich panel installation of energy consumption monitoring system replacement of spans with more efficient solutions., translated_summary

6 July 2021