Revision history of "9/6.5 URBANA REABILITATION OF THE MURED NUCLEO, CASTELO AND Involving (Contracted Studies and Projects) – Public Space" (Q2878303)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 November 2023

16 June 2023

12 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 08:3608:36, 29 July 2022DG Regio talk contribs 40,885 bytes +24,433 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 20:5320:53, 7 July 2021DG Regio talk contribs 9,400 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 10:0410:04, 7 July 2021DG Regio talk contribs 8,969 bytes +180 Changed label, description and/or aliases in en: translated_label
  • curprev 10:0410:04, 7 July 2021DG Regio talk contribs 8,789 bytes +1,134 Created claim: summary (P836): The operation corresponds to the rehabilitation of the public space in the center of Leiria Castle, involving interventions at the level of urban rehabilitation of the interior of the walled enclosure and exterior arrangements of the area surrounding the Castle and main accesses, namely the Largo de São Pedro., translated_summary

6 July 2021