Revision history of "Requalification of the Miradouro Half Orange" (Q2878296)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 November 2023

16 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 08:3608:36, 29 July 2022DG Regio talk contribs 43,085 bytes +26,897 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 20:5320:53, 7 July 2021DG Regio talk contribs 8,672 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 10:0410:04, 7 July 2021DG Regio talk contribs 8,241 bytes +103 Changed label, description and/or aliases in en: translated_label
  • curprev 10:0410:04, 7 July 2021DG Regio talk contribs 8,138 bytes +1,303 Created claim: summary (P836): The operation aims at requalifying the public space of the Miradouro and its green surroundings, thus promoting the social and territorial cohesion of this spatial unit. In addition to improving the urban image of the ensemble, it bridges the lack of green spaces and reinforces the physical and functional connections between the northern and southern zones of the Encosta. The eligible investment of EUR 388,217.59 with VAT comprises purchases of...

6 July 2021