Revision history of "Inclusive accessibility on the 25th of April Square" (Q2878182)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

16 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 08:3308:33, 29 July 2022DG Regio talk contribs 43,734 bytes +27,337 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 21:0521:05, 7 July 2021DG Regio talk contribs 8,633 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:5609:56, 7 July 2021DG Regio talk contribs 8,202 bytes +110 Changed label, description and/or aliases in en: translated_label
  • curprev 09:5609:56, 7 July 2021DG Regio talk contribs 8,092 bytes +1,249 Created claim: summary (P836): The operation aims to improve accessibility to public spaces and buildings for people with reduced mobility, proposing the elimination of architectural barriers, widening of walks, introduction of comfortable ramps and floors, road restrictions and relocation of urban furniture. It also aims at reducing GHG, inducing modal transfer to smooth modes. It corresponds to an eligible investment of EUR 270,000.00 already with VAT., translated_summary

6 July 2021