Revision history of "Network of pedestrian routes of Torres Vedras" (Q2878163)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

16 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 08:3308:33, 29 July 2022DG Regio talk contribs 43,028 bytes +26,669 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 21:0521:05, 7 July 2021DG Regio talk contribs 8,636 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:5609:56, 7 July 2021DG Regio talk contribs 8,205 bytes +104 Changed label, description and/or aliases in en: translated_label
  • curprev 09:5609:56, 7 July 2021DG Regio talk contribs 8,101 bytes +1,259 Created claim: summary (P836): The operation proposes the construction of a network of structuring pedestrian routes, establishing as a priority the connection between the public transport terminal, schools and the city center. The implementation of this action plays an essential role in meeting the targets of reducing GHG emissions by inducing modal shift from individual transport to soft modes. It corresponds to an eligible investment of EUR 166,747.20 with VAT., translated...

6 July 2021