Revision history of "Arrival and Confluence Stops – Phase 2 – Bus Terminal" (Q2878160)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

16 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 08:3308:33, 29 July 2022DG Regio talk contribs 40,489 bytes +24,875 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 21:0521:05, 7 July 2021DG Regio talk contribs 8,452 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:5609:56, 7 July 2021DG Regio talk contribs 8,021 bytes +116 Changed label, description and/or aliases in en: translated_label
  • curprev 09:5609:56, 7 July 2021DG Regio talk contribs 7,905 bytes +1,145 Created claim: summary (P836): The operation aims at the construction of a protective cover of the boarding docks of the Torres Vedras Bus Terminal. The improvement of the main public transport interface is intended to improve the conditions of service provision by increasing its use, aligning itself with national and European GHG reduction strategies., translated_summary

6 July 2021