Revision history of "Coimbra bike path – Coimbra B/Vale das Flores/Portela" (Q2878154)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

12 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 08:3308:33, 29 July 2022DG Regio talk contribs 42,626 bytes +25,829 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 21:0521:05, 7 July 2021DG Regio talk contribs 9,441 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:5609:56, 7 July 2021DG Regio talk contribs 9,010 bytes +114 Changed label, description and/or aliases in en: translated_label
  • curprev 09:5509:55, 7 July 2021DG Regio talk contribs 8,896 bytes +1,222 Created claim: summary (P836): The purpose of this operation is to promote the use of smooth and safe modes, such as bicycles and walking, discouraging the use of the car, leading to a reduction in the emission of greenhouse gases and the ton of oil equivalent. The implementation of these pedestrian and cyclable channels is accompanied by interventions that lead to reduced speeds of motorised traffic and reduced traffic volume., translated_summary

6 July 2021