Revision history of "Arrival and Confluence Stops" (Q2878141)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

16 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 08:3308:33, 29 July 2022DG Regio talk contribs 39,742 bytes +24,426 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 21:0421:04, 7 July 2021DG Regio talk contribs 8,390 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:5509:55, 7 July 2021DG Regio talk contribs 7,959 bytes +87 Changed label, description and/or aliases in en: translated_label
  • curprev 09:5509:55, 7 July 2021DG Regio talk contribs 7,872 bytes +1,143 Created claim: summary (P836): The operation aims at the construction of 12 Arrival and Confluence stops at strategic locations in the city of Torres Vedras. These interfaces play a key role in the operation of an intermodal transport system and align with national and European GHG reduction strategies through the focus on sustainable urban mobility., translated_summary

6 July 2021