Revision history of "Structural axis of Urban Mobility" (Q2878129)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

12 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 08:3208:32, 29 July 2022DG Regio talk contribs 42,773 bytes +25,968 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 20:5420:54, 7 July 2021DG Regio talk contribs 9,480 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:5509:55, 7 July 2021DG Regio talk contribs 9,049 bytes +92 Changed label, description and/or aliases in en: translated_label
  • curprev 09:5509:55, 7 July 2021DG Regio talk contribs 8,957 bytes +1,281 Created claim: summary (P836): With the present operation, it is intended to proceed to the construction of the pedestrian link between the southern area of the city, at the beginning of Professor Dr. Egas Moniz Avenue, and the industrial zone, in an extension about 563 meters, in order to continue the existing walks along the buildings and accesses, thus ensuring pedestrian access to the industrial area under better conditions of circulation and safety by pedestrians and roa...

6 July 2021