Revision history of "Urban Requalification – Rua Alexandre Herculano" (Q2877976)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

16 June 2023

12 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 08:2908:29, 29 July 2022DG Regio talk contribs 42,827 bytes +26,105 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 20:5920:59, 7 July 2021DG Regio talk contribs 9,432 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:5309:53, 7 July 2021DG Regio talk contribs 9,001 bytes +108 Changed label, description and/or aliases in en: translated_label
  • curprev 09:5309:53, 7 July 2021DG Regio talk contribs 8,893 bytes +1,241 Created claim: summary (P836): The intervention is in public and urban space, intending to qualify and modernise the main and historical shopping street, currently is in the process of physical, social and economic erosion. This intervention assumes as presuppositions the dynamisation of local economic activity, in particular traditional trade. This factor is considered indispensable for strengthening the vitality of the historic centre of Soure., translated_summary

6 July 2021